Who is George Galatis?

George Galatis was a senior nuclear engineer and whistleblower who reported safety problems at the Millstone 1 Nuclear Power Plant, relating to reactor refueling procedures, in 1996. The unsafe procedures meant that spent fuel rod pools at Unit 1 had the potential to boil, possibly releasing radioactive steam throughout the plant.

Every 18 months the Millstone 1 nuclear reactor was shut down so the fuel rods that make up its core could be replaced; the old rods, radioactive and burning hot, were moved into a 40-feet-deep body of water called the spent-fuel pool. One-third of the rods were moved into the pool under normal conditions. But in the 1990s Galatis realized that Millstone was routinely performing "full-core off-loads," moving all the hot fuel into the spent-fuel pool. In addition, the Millstone 1 routine ignored the mandated 250 hour cool-down period before a full core off-load, and sometimes the fuel was moved just 65 hours after shutdown, a violation that melted the boots of one worker.

We need you!

Help us build the largest biographies collection on the web!


Submitted
on July 23, 2013

Citation

Use the citation below to add to a bibliography:

Style:MLAChicagoAPA

"George Galatis." Biographies.net. STANDS4 LLC, 2024. Web. 22 May 2024. <https://www.biographies.net/people/en/george_galatis>.

Discuss this George Galatis biography with the community:

0 Comments

    Browse Biographies.net